Ask the warehouse before a material shortage reaches the floor

A complete bill of materials does not prove production can start. Is each material actually available? The stock figure on a screen does not tell the whole story about what the warehouse can supply for this order. A phone call may answer the question. By the next shift, it may be unclear who said what, whether a partial quantity was acceptable, or whether the suggested substitute reached the recipe.

The material check in infab.cloud gives that conversation a place in the order record before production starts. An authorised person requests a check from the order. The warehouse replies for each material line, and the order side decides whether to accept a proposed alternative. It is not a general purpose messaging channel for operators to report shortages during a shift. It is a structured exchange about the materials required by an order before those requirements turn into work on the floor.

What the question really asks

Imagine an order with three material lines. This is an illustration of the documented workflow, not a story about a particular customer. The first item is ready in full. Only some of the second is available. The warehouse suggests a different material for the third. Marking the whole order simply “materials available” would hide two important decisions. The partial quantity affects the conversation about when to proceed; the proposed substitute could change the recipe itself.

From the order detail, a manager, production lead or recipe engineer can request the check and add a note. The check gathers material linked lines from the current recipes for the order’s items. A request cannot be opened if there are no such lines. Nor can a second active check be opened against the same order. The first discussion needs to be closed before another begins. Delivered and cancelled orders cannot start a new check. These constraints keep the conversation attached to a live order rather than creating conflicting requests for a completed one.

The warehouse finds requests in the Material checks tab of Purchasing. Orders with the nearest delivery date appear first. This is a useful ordering of the queue, not a promise that material will arrive by that date. Each material line also displays the recorded stock balance. That balance is there for context; it is not automatically the answer. If the ERP stock figure is delayed, or the physical situation needs checking, a person in the warehouse still has to say what can be supplied.

Four replies, and why they differ

The warehouse can answer that the full requested quantity is available, that only part of it is available, that it is unavailable, or that another catalogue material is proposed. A partial reply records the available quantity. An unavailable reply can carry an expected date or explanatory note. An alternative reply identifies a different material, a quantity and the reason for proposing it. These are different statements. “We have some” is not the same as “use something else,” and neither statement should be silently turned into a production instruction.

Once every line is answered, the request moves to answered status. That status does not mean the order can be released without further thought, nor does it approve every substitute. The answers are visible back on the order so that the person responsible for the recipe can review them. In the three line illustration, the partial reply gives planning a concrete quantity to discuss. The alternative reply calls for an explicit decision. Treating both as a single red or green indicator would throw away the information the warehouse has supplied.

There is also a limit to what a stock balance can establish. The application exposes it to help the conversation, but the warehouse response is deliberately separate. Teams should avoid telling an operator that a screen quantity is proof that a particular material is already at their station. The material check happens earlier than that physical handover. Keeping those questions distinct prevents a neat looking planning record from disguising an incomplete preparation step.

A substitute is a recipe decision

When the warehouse proposes an alternative, an authorised person on the order can accept or reject it. Rejecting it leaves the original recipe line as it was. Accepting it does not erase the old line and overwrite its material name. The old material line is marked cancelled and retained in the history. A new line is created with the proposed material and quantity, connected to the same operation. Subsequent material issues and costing can then follow the replacement rather than a suggestion buried in a comment.

That change is subject to the recipe being editable. If its version is locked, the acceptance cannot simply alter it. This is a sensible boundary to test in a pilot: a conversation about a substitute and permission to change an established recipe are not the same action. Warehouse staff can propose what is physically possible; the order side owns the decision to alter the material requirement. Both parts should remain visible when someone later asks why a different material was used.

Closing a material check does not delete the discussion. The request, responses and decisions retain the people and times associated with them. This matters when a later shift needs to understand why work paused or why an alternative entered the recipe. But a recorded answer is not a purchasing instruction by itself. An unavailable reply does not automatically create a purchase order, and accepting an alternative does not create one either. Procurement still has its own decisions and workflow.

Do not mistake it for the station handover

infab.cloud also documents a separate “wait for material” gate for an operation during production. The material check concerns the order before production; the other gate concerns whether materials have actually reached the station for a work order. Warehouse availability does not confirm delivery to the station. Merging the two checks hides where a job is waiting.

A trial can use one order with several material lines. Request a check, answer a line in full, record a partial quantity on another, and propose an alternative on a third. Look at the order after accepting or rejecting the proposal, including what happens to the old recipe line. Compare that discussion with the later station preparation step. The point is not to make shortages disappear through software. It is to keep the question, warehouse answer and recipe decision connected, instead of relying on someone’s memory of a call.

For a broader view of how those records fit into production, the infab.cloud site describes the product approach; the documentation sets out the material check steps in detail.

Verification note: The request, warehouse responses and substitute decision were checked against the Turkish infab.cloud documentation and the product repository’s interface and API code. The sample order is an illustration, not a customer account.