When the part changes on the floor, which drawing applies?

A part is being machined when someone notices that a detail on its drawing needs to change. An updated file goes to the workshop, the operator finishes the job, and everyone moves on. Weeks later, someone asks which drawing governed the part that actually shipped with that order. Opening the latest file in a shared folder does not answer the question. The newest drawing and the drawing used for a particular work order are related, but they are not interchangeable records.

This is not about changing the materials and operations in a recipe version. It is about declaring whether a work order’s part conformed to its technical drawing, or recording that the drawing changed during the work. A recipe revision explains a planning decision. A drawing declaration ties a production decision to a particular job. Treating both as one generic “revision” can obscure what the team actually did on the floor.

Make the decision while the job is open

Consider a fictional machined bracket with a hole position marked on its drawing. During production, the team decides the position needs correction. This is an illustrative situation, not a customer’s design or a measured result. The question is specific: can the operator declare that the part matches the existing drawing, or should they upload a revised drawing and explain the change? Renaming a PDF might make the newest file easy to find, but it says little about the earlier work.

The infab.cloud shop floor documentation describes two choices when an operation has a technical drawing: declare that the part conforms, or record that it has changed. The second choice involves uploading a new drawing, selecting the drawing it replaces and entering a change note. In the product code, a declaration is connected to the work order, the person making it and the time. A reviewer can look at the decision made for the job, rather than inferring it from a product folder’s most recently modified file.

There is a timing boundary. The implementation allows a declaration on a work order that is in progress or waiting for quality inspection. It does not use the same action to revise a job that has not begun or one that has already closed. That is a good reason to address the drawing when the relevant people and files are still available, not to leave a vague note for someone on another shift to reconstruct later.

Keep the drawing that was replaced

A changed part does not always mean that one PDF simply overwrites another. The new drawing may replace a specific earlier drawing, or it may be an additional detail. The recorded revision can distinguish those cases: a replacement points back to the earlier drawing; an additional drawing has no predecessor. A change note is required. The record also identifies the work order in which the change took place. A replaced drawing remains in the history rather than being deleted.

This helps answer two different questions. “Which drawing is current for the product?” is not the same as “what drawing belonged to that past order?” The accepted technical decision describes a drawing reflecting the part as built for the order and a current drawing on the product side. Keeping the older revision makes it possible to inspect a past job without quietly rewriting its history with today’s drawing. The same decision explicitly does not promise that every future order automatically inherits the newest drawing: carrying it into a newly copied recipe is described as separate future work.

The meaning of “current” therefore needs care in a production review. A product’s current drawing is useful, but it cannot by itself replace the declaration attached to the job being investigated. Read the work order, the change note and the drawing relationship together. The product code checks that a drawing named as the predecessor belongs to the same operation line and has not already been replaced. Selecting a drawing from another operation, or trying to replace an already superseded one, is not a valid revision in this flow.

What does a required declaration actually enforce?

The documented setting lets a manager require drawing declarations for work with drawings. In the implementation, the default setting is optional. When required mode is selected, a work order with a drawing cannot be completed without a declaration. A different operation with no drawing is not blocked merely because the setting exists. It is a targeted checkpoint, not an instruction for every operator to fill in an irrelevant field on every task.

A checkpoint is not the same as engineering approval. Preventing completion without a declaration does not establish that an engineering team reviewed or authorised the design change. The accepted technical decision excludes a formal engineering change approval process, and the product repository lists that approval as deferred work. If your workshop needs a signed engineering change, define who can authorise it and where that authorisation belongs. Do not treat the shop floor’s “changed” entry as a substitute for a process the product does not claim to provide.

Try a narrow, safe example

You can examine this workflow without using an actual customer’s drawing. Set up an example operation with a sample drawing and look at the two declaration choices on the shop floor screen. For a conforming part, check whether the work record shows who made the declaration and when. In a separate example, record a revised drawing and a short explanation. Compare the drawing that is now current with the one still available in the history, and confirm which work order carries the change.

Also compare the optional and required settings rather than assuming one policy applies everywhere. A shop may have some operations with formal drawings and others without them. The goal of the trial is not to tick a box: it is to see whether the person investigating the order later can tell what changed, when it changed and what file the workshop worked from. That question is harder to answer if the only evidence is a filename in someone’s inbox.

To compare that work order decision with your own production process, infab.cloud outlines the product, while the shop floor documentation describes the drawing declaration in more detail.

Verification note: This article was checked against the infab.cloud shop floor documentation, the accepted drawing revision decision, and the implementation and tests in the product repository. The bracket example is fictional.