Two plants, one production record: where do the work and materials belong?

A cutting job is scheduled at one plant, but its machine is fully booked. Another plant has room. Moving the job sounds straightforward until someone asks where the sheet material is, which team will record the work and which site’s delivery report will include the order. A shared item code is not a shared physical location. Moving a line on a production board cannot, by itself, move metal across town.

Consider an illustrative order with cutting and assembly operations. The first plant has the material, while the second has available cutting capacity. This is not a customer story or a measured outcome. It is a way to separate two decisions that are often collapsed into one: where the work should happen and where the material should be. If only the work order moves, the second workshop may see a job that it cannot supply from its own warehouse.

Shared definitions, local execution

The infab.cloud multi-site documentation describes one central installation for several plants or storage locations within a company. Customers, suppliers, products, bills of materials and the material and operation catalogs stay shared. Warehouses and stock, machines, employees, the order’s production site and work orders belong to particular sites. Teams can therefore work from the same product definition without pretending that every workshop has the same machines or inventory.

An installation starts with a main site. Until a second site is added, the site selector and transfer options stay hidden. With multiple active sites, a selector filters production and efficiency and delivery reports. The all-sites view still respects user access.

Sites have a purpose as well as a name. In the management settings, a site can be defined as a production site or a storage-only site. A storage-only location can hold inventory, but it cannot receive a production work order. That rule keeps a warehouse address from appearing as available factory capacity. It also encourages a useful question before adding a location: does anyone actually manufacture there, or is it a place where goods are held?

The order’s site is not the entire answer

The production site selected on an order determines where its work orders open when the order enters production. If that production site changes later, unstarted work orders move to the new site; started work orders stay where they are. The product’s site tests also reject an attempt to transfer a work order that is already in progress. This protects the history of work already underway rather than assigning it retrospectively to a different workshop.

An individual unstarted work order can be moved to another production site from the production panel by a manager or production lead. The documentation says the action records who moved it and when. For the example cutting job, the first check is whether the operation has started. The second is whether the destination can actually manufacture. A storage-only site is not a valid target. The third check is independent of both: whether the material is physically and digitally available at the destination.

Changing an order’s production site affects its unstarted work orders; transferring one operation changes a particular eligible work order. Neither action transfers stock. The board can update while the material remains at its original location.

Stock must have an address

The stock screen’s Locations view shows quantities by warehouse and site. To move stock, a user records a source warehouse, destination warehouse and quantity, with the lot number for lot-tracked material and an optional document note. A transfer removes quantity from the source and adds it to the destination; it does not increase the company’s total. The lot number remains attached to the movement, preserving the trace. The documented model treats the transfer as immediate rather than maintaining a separate in-transit state. If a truck is still on the road, staff should not assume the system is tracking that transit stage for them.

In the example, moving a lot of sheet material is a stock decision alongside the decision to relocate cutting. Checking the company-wide balance alone would hide a shortage at the destination. The documentation says that, when a material’s default warehouse is at another site, shop-floor issues and approved consumption are taken from a warehouse at the job’s site. Before starting work, check the balance at that particular location rather than relying on a reassuring company total.

Receiving matters too. With several warehouses, staff select the destination when goods are received. A wrong location can leave the global balance looking plausible while local stock runs short. Before adjusting stock, inspect the receipt and any transfer.

A site filter is not an access policy

A manager can see all sites. For other roles, accessible sites are set on the user record; a user with no assigned site is treated as belonging to the main site. The documented scope covers work orders, employees and reports. Access tests in the product repository show that explicitly requesting another site’s work orders still does not expose them to an unassigned user. Selecting a site on the screen is therefore not a workaround for authorization, and a combined company report is not necessarily available to every operator.

Reports also need to be read according to their attribution rules. Daily efficiency is calculated against the employee’s site; on-time delivery is calculated against the order’s production site. These are not interchangeable labels. When comparing plants, first identify which measure you are looking at, then check the site attached to the relevant employee or order. Otherwise a transfer made for capacity reasons may be followed by an argument about whose performance the number represents, not about what actually happened.

The central approach has a limit. If a plant loses its connection to the central server, staff there cannot clock in to work. This is not a set of independent local servers that reconcile later. Plan network access alongside permissions and warehouses.

A practical starting point is to list which sites manufacture and which merely store stock. Then map each warehouse, the people who need access, and the production site on an order. For one representative job, check the work order’s location and the relevant lot’s warehouse separately. Review the local production view and the reports after a transfer rather than assuming that all records follow the job automatically. infab.cloud shows the wider production workflow, while its multi-site documentation sets out the screens and constraints behind these decisions.

Verification note: This article was checked against the infab.cloud multi-site documentation, the accepted site architecture decision and the product’s site and access tests.