Which company settings does an agent use when the connection fails?
Which company settings does an agent use when the connection fails?
If the company changes an agent’s settings this morning, should a workstation that loses its connection continue on yesterday’s settings? Keeping work moving sounds sensible. But if the change affects the model gateway or default permissions, an older session may no longer operate under the assumptions its colleagues share. Availability and consistency are competing needs here. Before deciding what can continue, a team needs to know which settings actually reached each session, and which launch path the employee used.
Imagine procurement preparing a new comparison of supplier quotes while IT changes a shared model setting. A buyer’s connection drops before they start. A locally stored copy of the old settings might make it tempting to keep working. The resulting spreadsheet could look perfectly ordinary, yet the team’s question remains: was the session launched with the current gateway, plugin and permissions? This is a hypothetical workflow, not a customer incident. It illustrates why a completed piece of work does not, by itself, tell us which rules governed its preparation.
A current signed bundle and a fallback serve different purposes
Accepted ADR-0011 in agentic-organization chooses managed configuration inside the sandbox container. In the normal 3pa run flow, the client fetches the configuration bundle and a public key, verifies the signature and mounts the verified configuration at the container’s managed settings path. If signature verification fails, that normal flow refuses to start. The backend assembles settings such as the plugin, base instructions, gateway, MCP connection, sharing mode and permission defaults. Central delivery makes it possible to change these settings without rebuilding each employee’s laptop.
The ADR also describes a fallback configuration baked into the container image. That copy is for an offline or --no-verify path, not evidence that the latest company bundle was fetched and checked. There is another important distinction: the current 3pa run code checks gateway reachability and the persona token before launching. When the gateway is unavailable, the normal command stops. It would be misleading to say the mere presence of a fallback file means an ordinary invocation automatically switches into a working offline mode. A stored file and an available offline operating procedure are not the same thing.
Why not copy an organisation’s settings into every project directory? Different folders would then carry different revisions, and a change might reach one employee long before another. Why not just serve a remote opencode configuration? The precedence described in ADR-0011 places remote settings below user and project settings. The managed file inside the container was selected to give shared settings a higher priority in that resolution order. Signing answers a separate question about the origin of the distributed bundle. None of this certifies the accuracy of a supplier comparison or approves a purchase. Trusting the configuration channel and reviewing the business result remain different jobs.
Our earlier piece on who gets the final say over agent settings examined the hierarchy of configuration. The continuity question is more specific: when colleagues start sessions through different paths or at different times, do they actually work under the same rules? A managed file outranking a project file does not erase the distinction between yesterday’s baked fallback and today’s verified bundle. Central control is not the same as simultaneous delivery to every session.
Continuity depends on the job, not just the software
Production may find a missing agent especially disruptive at a shift handover. Procurement might be able to compare quotes manually for a while. Finance may prefer to pause a workflow rather than handle payment information under settings that could be out of date. HR should ask whether a document involving employee information can move through an alternative route at all. IT cannot settle these differences with a single checkbox labelled “allow offline.” The people responsible for each process should decide which tasks wait, which continue manually under human review and whether any exceptional launch route is appropriate.
Such a plan must also account for the security limit described in the ADR. ADR-0011 explicitly records remaining bypass surfaces involving environment variables such as OPENCODE_PERMISSION and configuration merging. Its proposed runtime assertion of critical settings in the plugin is not marked complete. The sandbox entrypoint clears most OPENCODE_* variables, but that is not proof that every route around the settings has been closed. The --no-verify option is another deliberate departure from the signed normal path. The accurate claim is that the verified launch establishes a particular boundary, while other paths and remaining bypasses still need separate treatment. It is not a guarantee that every session is impossible to alter.
A useful continuity note can begin with three conditions rather than one broad “offline” label. First, if the gateway cannot be reached, normal 3pa run will not start. Second, if the bundle is available but its signature fails verification, the verified path still will not start. Third, choosing to skip verification means the fallback must not be described as today’s authenticated organisation settings. Write down who may make that choice and what work, if any, may be done afterwards. Then test a realistic change to a shared setting alongside a simulated connection problem. The result to inspect is not just whether the command starts, but whether employees and process owners understand the different conditions.
Even when the verified route works, a department still reviews the content the agent produces. A finance calculation can be wrong under the right gateway. A production handover can omit a late update even if its plugin loaded correctly. An HR summary might require a second person’s approval regardless of the launch path. Conversely, a blocked startup is not automatically a product failure to be worked around; it may be the outcome the organisation chose for that category of work. Naming these distinctions in advance is more useful than promising uninterrupted automation without a tested exception process.
The design question is therefore not simply whether an agent has a spare settings file. It is whether the organisation can distinguish current verified settings from a fallback when the network or signing path fails. ADR-0011 in agentic-organization makes that distinction explicit. For your own teams, which tasks should wait for the verified path, and which have a clearly defined human alternative?
Verification note: The design and its current limits were checked against ADR-0011, backend/api/well_known.py, packages/cli/src/commands/run.ts, packages/cli/src/utils/wellknown.ts, sandbox/entrypoint.sh and the managed configuration guide in the agentic-organization project. The baked fallback is not presented as an automatic offline mode or as proof of completed bypass hardening.